{"id":20509,"date":"2021-04-14T01:43:07","date_gmt":"2021-04-14T01:43:07","guid":{"rendered":"https:\/\/www.meetyoucarbide.com\/?p=20509"},"modified":"2021-04-14T01:43:08","modified_gmt":"2021-04-14T01:43:08","slug":"tightening-technical-requirements-for-installation-process-of-equipment-and-pipeline-flange","status":"publish","type":"post","link":"https:\/\/www.meetyoucarbide.com\/tightening-technical-requirements-for-installation-process-of-equipment-and-pipeline-flange\/","title":{"rendered":"Tightening technical requirements for installation process of equipment and pipeline flange"},"content":{"rendered":"
1.Gasket: during installation, ensure that the gasket is new, clean and dry, and check whether the gasket is defective and damaged; the old gasket cannot be reused; before installation, confirm that the size and grade of the gasket used are consistent with the identification of flange.<\/p>\n\n\n\n
2.Flange: check whether the flange face is damaged before installation, If scratches, nicks, mud, corrosion and burrs, dents and scratches passing through the water line of flange sealing surface in radial direction, and the depth of scratches is more than 0.2mm, and the covering surface is more than half of the width of gasket sealing surface, the flange must be replaced or the sealing surface must be reprocessed and repaired; the position of nut support surface on the back of flange should be parallel and smooth; check whether the flange is aligned, and the inspection method shall be in accordance with 6.2 of sh3501-2011 Pipeline installation requirements.<\/p>\n\n\n\n
3.Bolt and nut: check whether the bolt and nut are used correctly according to the design requirements of equipment and pipeline; the thread and contact surface shall be free of dirt, rust, double skin, scratch, burr, debris and other external substances that affect the torque in the tightening process; it is not allowed to repair the bolt by welding or machining; at least two threads shall be exposed outside the nut after the flange is installed and tightened;<\/p>\n\n\n\n
Bolts and nuts must be lubricated before use, so as to have low friction coefficient when tightening bolts and improve the anti sliding wire and anti-corrosion performance of bolts and nuts; stud thread, nut thread and contact surface must be degreased and dried before using lubricating oil; unified lubrication method shall be properly used for bolt thread, nut thread, nut bearing surface, washer and nut supporting surface on flange Lubricating oil; use high temperature anti seizing agent as required.<\/p>\n\n\n\n
No torque box spanner or hammer spanner: suitable for fastening flange of general equipment and pipeline, selected according to bolt size and flange pressure grade. The tightening requirements are as follows:<\/p>\n\n\n\n
1. The maintenance unit formulates the fastening scheme, fastens the flange symmetrically, and numbers the fastening sequence. Refer to Fig. 1 and Fig. 2 for numbering.<\/p>\n\n\n\n
2. Position the gasket with 4 bolts at the positions of 1, 2, 3 and 4 to ensure that the center of the spiral wound gasket is within the flange edge.<\/p>\n\n\n\n
3. Tighten the positioning bolt by hand, then insert other stud bolts and balance the load by hand, so as to ensure that at least 2 threads are exposed at each end of the nut.<\/p>\n\n\n\n
4. According to the on-site equipment and flange, the tightening times (at least 3 times) and the hammering load (strength) of each tightening should be reasonably determined according to the calculation of tightening one circle. The tightening hammering load (strength) should be tightened from small to large in turn (such as 50%, 80%, 100% increment). The load should not be too fast or too large to prevent gasket seal failure.<\/p>\n\n\n\n
5. Tightening sequence of no torque box spanner or hammer spanner each time:<\/p>\n\n\n\n
Tighten the two radially opposite bolts to the given hammering load (strength) of the bolts;<\/p>\n\n\n\n
Fasten another pair of bolts about 90 degrees away from the previous two bolts along the circumference;<\/p>\n\n\n\n
Continue tightening until all the remaining bolts are tightened to a given hammer load.<\/p>\n\n\n\n
Finally, according to 100% hammering load (force), all bolts shall be tightened clockwise or counterclockwise.<\/p>\n\n\n\n