欧美人妻精品一区二区三区99,中文字幕日韩精品内射,精品国产综合成人亚洲区,久久香蕉国产线熟妇人妻

Many customers complain that the service life of cemented carbide molds they buy is very short, and they often crack after less than oneortwo times of stamping. That’s because first of all, cemented carbide is a hard but brittle material, and special attention should be paid to the maintenance of cemented carbide molds in use. Secondly, customers usually haven’t considered these three aspects. Today we will share with you in an article how to extend the service life of your cemented carbide mold through these three points.

3 ASPECTS DETERMINE THE SERVICE LIFE OF YOUR CEMENTED CARBIDE MOLD 2

Have you selected cemented carbide molds with a good quality? ?

Quality includes the following:

1. It must have high resistance: the mold must accept great extrusion pressure, bending stress, impact and other messy loads at the same time during the extrusion process.

2. It must have very good wear resistance: the mold should have high wear resistance to ensure normal service life and produce a large number of qualified extrusions.

3. There must be sufficient thermal stability: during each continuous production, the temperature rise of the mold sometimes reaches or exceeds 200 ℃, which will reduce the strength and hardness of the mold material with 160~180 ℃ as the tempering temperature. Therefore, the mold material with higher temperature rise should have excellent tempering stability.

4. It must have outstanding technicality: the manufacturing cycle of cold extrusion die is long, the technology is messy, and the accuracy requirement is high. Generally, casting, cutting, heat treatment, grinding or other finish machining are required.

Do you use cemented carbide for production correctly?

When using cemented carbide dies, we should pay attention to the following points:

1. During the working process of the machine and equipment, the technician monitors the working condition of the equipment in real time to eliminate the machine faults in advance. Only in this way can we ensure the smooth progress of the whole production process.

2. The cemented carbide mold must be in a safe state before it is used and in the process of idle parking.

3. Cemented carbide dies belong to high maintenance rate equipment because of long-term load work. During maintenance, the machine should be firmly fixed with supports, the equipment should be shut down, and the whole set of equipment should be in a static state before starting the next step of maintenance work.

4. The gear oil in the cemented carbide mold is very irritating to the skin. When checking whether there is leakage, don’t touch it with your hands. If necessary, wear gloves or use paper to check, so as to avoid direct skin contact. Different cemented carbide molds need to be careful in the processing process, with safety as the main factor.

5. Select the appropriate reduction ratio. Cemented carbide die itself has the characteristics of hardness and brittleness. If it is used for shrinkage drawing with large area shrinkage, it is easy to cause the die to bear the stress and be broken and scrapped. Therefore, it is necessary to select the appropriate area shrinkage according to the different mechanical properties of wire rod.

3つの側(cè)面が超硬合金の耐用年數(shù)を決定します3

Do you regularly repair your cemented carbide mold?

Regular maintenance of cemented carbide dies is a major factor that can effectively improve the service life of cemented carbide dies.

For example, the installation and debugging method of the mold should be appropriate. In the case of hot runner, the power wiring should be correct, the cooling water path should meet the design requirements, the parameters of injection molding machine, die casting machine and press machine should meet the design requirements in the production of the mold, etc.

When using the mold correctly, it is also necessary to maintain the mold regularly. The guide post, guide sleeve and other parts with relative movement of the mold should be often filled with lubricating oil. For forging mold, plastic mold, die-casting mold and other molds, lubricant or molding agent should be sprayed on the surface of formed parts before each mold is formed.

The planned protective maintenance of the mold and the data processing in the maintenance process can prevent the problems that may occur in the production of the mold and improve the efficiency of maintenance work.

コメントを殘す

メールアドレスが公開されることはありません。 が付いている欄は必須項目です

久久久久人妻一区精品加勒比| 操老骚逼三级黄视频| 新视觉亚洲三区二区一区理伦| 日本十八禁大骚逼| 中文字幕欧美中日韩精品| 美女荒郊野外找男人靠逼| 欧美日韩一区精品一区精品| 精品免费久久久久久久久| 亚洲av 又黄又爽十大| 日本高清一区二区三区不卡| 欧美一区二区三区高清性群p| 日韩人妻精品一区二区三区99| 国产乱色国产精品免费播放| 嗯嗯嗯啊啊啊好湿好痒好多水视频| 小穴抽插流水视频| 娇嫩的被两根粗大的np| 黄色片视频1024| 成人黄色网破处在线播放| 日韩激情精品久久久一区二区| 久久综合日韩亚洲精品色| 久久国产精品二卡| 日韩欧美一级特黄大片欧| 妓女综合网在线观看| 日韩午夜精品中文字幕| 伊人久久综合无码成人网| 一区二中文字幕在线看国产一区| 国产成人精品久久久成人| 99久久久国产精品k影| 日韩久久奶茶视频| 美女人的逼免费观看| 鸡巴操美女小穴羞羞视频| 久久久久精品无码专区喝奶| 男人操女人黄片黄色| 日本福利一区二区视频| 小嫩骚逼操死你视频| 国产精品一区二区三区涩涩av| 夜夜嗨av少妇一二三区| 欧美综合区自拍亚洲综合| 无码人妻精品一区二区三区蜜桃| 色男人天堂亚洲男人天堂| 97人妻精品一区二区三区视频|